MMA floor system cold setting
It's a common scenario; a chiller room at 0°C needs coating with a floor paint but can't be switched off to allow the temperature to increase to 10°C+. A conventional epoxy paint will actually not set at such a temperature, remaining wet for days, weeks if not permanently (depends on the formulation).
Tremco illbruck has the answer to this problem. We offer methyl methacrylate (MMA) flooring systems which can even cure down to -10degC. Please click here to view the video.
The tremco illbruck website has brochures and system data sheets covering the application and performance criteria of the products.
Click here to download the Rapide MMA Flooring brochure or call 01942 251400.
|